PMP认证考试练习题(19,20)

时长:90分钟 总分:100分

65浏览 0人已完成答题

题型介绍
题型 单选题
数量 40
一、PMP认证考试练习题(19)
1.
history has shown that project managers can be trained in a combination of ways. which method is usually
preferred by most companies?
问题详情





2.
the purpose of configuration management is to:
问题详情





3.
three types of written media used in organizations are (    ), (    ), and (    ).
问题详情





4.
which of the following is considered a direct cost for producing a widget?
问题详情





5.
(    ) best describes the goal of a project in its relationship with the customer, from initial contact
through delivery.
问题详情





6.
a communicator can present information using the following media except:
问题详情





7.
advantages of the functional (hierarchical) form of organization include (    ) and creation of technical
competence.
问题详情




8.
quality and (    ) are directly related.
问题详情





9.
resource leveling will often affect the project by making it:
问题详情





10.
selection criteria for project selection include:
问题详情





11.
the statement of work (sow) is developed during the (    ) cycle.
问题详情





12.
which of the following depreciation methods provides for accelerated depreciation of an asset:
问题详情





13.
a plan has budgeted three weeks of effort for consultants, but the job was done in only two weeks. calculate the variance:
问题详情





14.
a warranty may not be a remedy for products delivered unfit when (    ) .
问题详情





15.
graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:
问题详情





16.
quality control is normally performed by the (    ) .
问题详情





17.
situations calling for a matrix organization include outside pressure for dual focus, (    ) and
pressure for high information processing
capability.
问题详情





18.
the net present value of $110 one year from now at 10% is:
问题详情





19.
the receiver filters messages based on all but the following:
问题详情





20.
going from level 2 to level 4 in the work breakdown structure will result in
问题详情





二、PMP认证考试练习题(20)
21.
on november 1, $1000 worth of work on task a was supposed to have been done (bcws); however, the bcwp was $850. calculate the
schedule variance:
问题详情





22.
the quality risk (    ) .
问题详情





23.
the act of conducting or supervising the exchange of information is:
问题详情





24.
the core function of the project manager is
问题详情





25.
the future value of an annual income flow of $1000 for 2 years at 10% is:
问题详情





26.
the initial cost of a product and the product's operation and maintenance costs (    ) .
问题详情





27.
all of the following may hinder a person's ability to transmit/receive a message except:
问题详情





28.
quality improvement programs are normally associated with which two of the following?
问题详情





29.
the utility theory (    ) .
问题详情





30.
the document authorizing functional areas to charge against the project is the:
问题详情





31.
the purpose of a dummy activity in an activity-on-arrow diagram is to:
问题详情





32.
when planning, organizing, coordinating, and controlling a project an important human resources skill or ability would be
问题详情





33.
which is not a negotiation tactic?
问题详情





34.
which of the following is referred to as sunk cost:
问题详情





35.
a project manager believes that modifying the scope of the project may provide added value for the customer. the project manager should:
问题详情





36.
as a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:
问题详情





37.
group brainstorming encourages all of the following except:
问题详情





38.
non-conformance penalties are a form of (    ).
问题详情





39.
risk event status is defined as (    ) .
问题详情





40.
there are hard causes of conflict (e.g. conflicting schedules) and soft causes. soft causes are as important as hard causes. soft causes
include diversity of disciplinary expertise, (    ), and the project manager's power of reward and punishment.
问题详情